Construction and Early Deployment
Half Moon was laid down as a small seaplane tender (AVP-26) on 10 March 1942 by Lake Washington Shipyards, Houghton, Washington, and was launched as such on 12 July 1942, sponsored by Mrs. T. A. Gray. In March 1943 she was selected for conversion into a motor torpedo boat tender and redesignated AGP-6, but she was so close to completion as a seaplane tender that it soon was decided to convert seaplane tender USS Oyster Bay (AVP-28) into a motor torpedo boat tender instead; Oyster Bay was designated AGP-6 and became USS Oyster Bay (AGP-6). Half Moon, meanwhile, was again classified as a seaplane tender, again designated AVP-26 on 1 May 1943 and commissioned as such on 15 June 1943 with Commander W. O. Gallery in command.
Half Moon spent her first months in shakedown training off California, and was then assigned to the United States Pacific Fleet. Departing San Diego, California, on 25 August 1943, she embarked a United States Marine Corps air group at Pearl Harbor, Hawaii, and steamed into Vila Harbor, New Hebrides, on 14 September 1943. She then sailed to Brisbane, Australia.
Read more about this topic: USS Half Moon (AVP-26)
Famous quotes containing the words construction and/or early:
“No real vital character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the authors personality, developing by internal necessity as much as by external addition.”
—T.S. (Thomas Stearns)
“Perhaps the most valuable result of all education is the ability to make yourself do the thing you have to do, when it ought to be done, whether you like it or not; it is the first lesson that ought to be learned; and however early a mans training begins, its probably the last lesson that he learns thoroughly.”
—Thomas Henry Huxley (182595)