USS George Washington (SSBN-598) - Construction and Launching

Construction and Launching

George Washington's keel was laid down at Electric Boat Division of General Dynamics, Groton, Connecticut on 1 November 1957. The first of her class, she was launched on 9 June 1959 sponsored by Mrs. Robert B. Anderson, and commissioned on 30 December 1959 as SSBN-598 with Commander James B. Osborn in command of the Blue crew and Commander John L. From, Jr. in command of the Gold crew.

George Washington was originally laid down as the attack submarine USS Scorpion (SSN-589). During construction, she was lengthened by the insertion of a 130 ft (40 m)-long ballistic missile section and renamed George Washington; another submarine under construction at the time received the original name and hull number. Inside George Washington's forward escape hatch, a plaque remained bearing her original name. Because the ballistic missile compartment design of George Washington would be reused in later ship classes, the section inserted into George Washington was designed with a deeper test depth rating than the rest of the submarine.

Read more about this topic:  USS George Washington (SSBN-598)

Famous quotes containing the word construction:

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)