Construction and Commissioning
The third USS Brunswick, she was laid down on 27 May 1968 at Lowestoft, England by Brooke Marine Ltd.; launched on 14 October 1969; sponsored by the wife of Vice Admiral David C. Richardson, USN (Ret.); delivered to the Navy at the Norfolk Naval Shipyard on 21 November 1972; and commissioned there on 19 December 1972, Lt. Comdr. John B. Haskins in command.
Brunswick finished out 1972 and began 1973 fitting out at Norfolk. On 13 March 1973, she got underway for the Pacific Ocean. Along the way she visited Brunswick, Georgia and Montego Bay, Jamaica. She transited the Panama Canal on 29 March and, after visits to Acapulco and San Francisco, arrived in Pearl Harbor on 31 May. She conducted shakedown training during the month of July and, early in August, passed final contractor's trials. On 11 September, she began a three-month post-shakedown availability followed by a restricted availability at the Dillingham Shipyard. Brunswick completed repairs on 31 January 1974 and began normal operations in the Hawaiian Islands.
Read more about this topic: USS Brunswick (ATS-3)
Famous quotes containing the word construction:
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)