USS Bering Strait (AVP-34) - Construction, Commissioning, and Shakedown

Construction, Commissioning, and Shakedown

Bering Strait was laid down on 7 June 1943 at Houghton, Washington, by Lake Washington Shipyard. She was launched on 15 January 1944, sponsored by Mrs. George F. Cornwall, and commissioned at her builder’s yard on 19 July 1944 with Commander Walter D. Innis in command.

After fitting out and conducting her initial sea trials in Puget Sound, Bering Strait departed Seattle, Washington, on 10 August 1944. She reached Naval Air Station Alameda at Alameda, California, on 13 August 1944. From 17 August 1944 to 13 September 1944, she conducted her shakedown, covering areas such as ship control, communications, general drills, engineering and damage control instruction, gunnery training, and antiaircraft and antisubmarine work. Proceeding to Los Angeles, California, upon completion of that training, Bering Strait underwent two weeks of repairs and alterations at Terminal Island Naval Drydocks at Terminal Island, California.

Read more about this topic:  USS Bering Strait (AVP-34)