USS Baton Rouge (SSN-689) - Construction and Commissioning

Construction and Commissioning

The contract to build Baton Rouge was awarded to Newport News Shipbuilding of Newport News, Virginia, on 8 January 1971, and her keel was laid down on 18 November 1972. Launched on 26 April 1975 in the presence of sponsor Mrs. Felix Edward Hebert, wife of the United States Representative from the First District and the former Chairman of the House Armed Services Committee, Baton Rouge was commissioned on 25 June 1977, with Commander Thomas C. Maloney as her first captain.

Based at Norfolk and assigned to Submarine Squadron 1, Baton Rouge's immediate history following the commissioning was characterized by shakedown training in New London, Connecticut, among other tests. During 5–29 July, she performed drills off the New England coast, returning to Norfolk for a month-long post-shakedown upkeep. From September 1977 to August 1978, she participated in numerous other tests, such as acoustic trials in Exuma Sound, The Bahamas, and weapons tests off Port Everglades, Florida. During this time, she returned periodically to Norfolk, and docked alongside USS L. Y. Spear, for upkeep, the longest of which spanned from February to August.

Read more about this topic:  USS Baton Rouge (SSN-689)

Famous quotes containing the word construction:

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)