Construction and Commissioning
Absecon was laid down on 23 July 1941 at Houghton, Washington, by Lake Washington Shipyard. She was launched on 8 March 1942, sponsored by Mrs. Robert L. Moon, Jr., the daughter of Captain G. E. Davis — who was then the chief of staff to the Commandant of the 13th Naval District — and the wife of Commander Robert L. Moon, Jr.. Absecon was unique among the Barnegat-class ships in that she was the only one fitted with an aircraft catapult and cranes for handling floatplanes. Her redesign from the standard seaplane tender configuration resulted from the U.S. Navy's need for pilots to gain experience needed to qualify for catapult operations in battleship- and cruiser-based floatplane aviation units. Absecon was converted to this configuration during construction. She commissioned at the Puget Sound Navy Yard at Bermerton, Washington, on 28 January 1943 with Commander Robert S. Purvis in command, and completed her fitting out period on 14 February 1943
Read more about this topic: USS Absecon (AVP-23)
Famous quotes containing the word construction:
“When the leaders choose to make themselves bidders at an auction of popularity, their talents, in the construction of the state, will be of no service. They will become flatterers instead of legislators; the instruments, not the guides, of the people.”
—Edmund Burke (17291797)