Construction
The six-boat group that included UB-43 and UB-47 was ordered in July 1915, and both boats had been laid down in early September. This group was selected by the German Admiralstab for deployment to the Mediterranean, but, unlike the smaller UB I boats, they could not as easily be transported overland by rail. Weser prepared the boats for rail shipment by cutting the boat sections longitudinally, and sent all the materials, along with German shipyard workers, to Pola, where the boats were reassembled. UB-43 was launched in early April 1916, while UB-47 followed in June.
Read more about this topic: U-43 Class Submarine (Austria-Hungary)
Famous quotes containing the word construction:
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)
“No construction stiff working overtime takes more stress and straining than we did just to stay high.”
—Gus Van Sant, U.S. screenwriter and director, and Dan Yost. Bob Hughes (Matt Dillon)
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)