Trondheim Tramway - Future Expansion

Future Expansion

Advocates for the tram have suggested expanding the tram from its present terminus at St. Olav's Gate through the city core to Trondheim Central Station or Nedre Elvehavn onwards to Brattøra and Trondheim Port. This has been supported by the city council, but no definite decision has been made. Estimates of costs lay between NOK 50 and 80 million, with completion in 2009 at the same time as Nordre Avlastningsvei.

A plan to extend the network by building a line from Munkvoll to the new Byåsen Upper Secondary School was dropped in 2004 after heated political discussions.

Read more about this topic:  Trondheim Tramway

Famous quotes containing the words future and/or expansion:

    complaint of present days
    Is not the certain path to future praise.
    George Gordon Noel Byron (1788–1824)

    We are caught up Mr. Perry on a great wave whether we will or no, a great wave of expansion and progress. All these mechanical inventions—telephones, electricity, steel bridges, horseless vehicles—they are all leading somewhere. It’s up to us to be on the inside in the forefront of progress.
    John Dos Passos (1896–1970)