Technical Features
The pipeline is 130-kilometre (81 mi) long and it has a capacity of 860 thousand barrels per day (137 thousand cubic metres per day). Its terminal installations are located in Charco Azul Bay, 7 kilometres (4.3 mi) south of Puerto Armuelles, with three docks constructed to receive supertankers, a system to treat ballast water, and three large tanks with a total capacity of 2.5 million barrels (400 thousand cubic metres) of crude oil. From 1979 to 1982, before construction of the pipeline, these facilities were utilized to transfer petroleum from large supertankers (200,000 tons) to smaller tankers (65,000 tons) that could transit the Panama Canal.
Read more about this topic: Trans-Panama Pipeline
Famous quotes containing the words technical and/or features:
“The axioms of physics translate the laws of ethics. Thus, the whole is greater than its part; reaction is equal to action; the smallest weight may be made to lift the greatest, the difference of weight being compensated by time; and many the like propositions, which have an ethical as well as physical sense. These propositions have a much more extensive and universal sense when applied to human life, than when confined to technical use.”
—Ralph Waldo Emerson (18031882)
“Art is the child of Nature; yes,
Her darling child, in whom we trace
The features of the mothers face,
Her aspect and her attitude.”
—Henry Wadsworth Longfellow (18071882)