Technical Features
The pipeline will be 1,420 millimetres (56 in) in diameter with a working pressure of 100 standard atmospheres (10,000 kPa). The initial capacity will be 27 billion cubic metres (950 billion cubic feet) of natural gas per year of which 2 billion cubic metres (71 billion cubic feet) will be provided to Afghanistan and 12.5 billion cubic metres (440 billion cubic feet) to each Pakistan and India. Later the capacity will increase to 33 billion cubic metres (1.2 trillion cubic feet). Six compressor stations would be constructed along the pipeline. The pipeline was expected to be operational by 2014.
The pipeline's cost is estimated at US$7.6 billion. The Asian Development Bank has played a leading role in coordinating and facilitating the TAPI negotiation process. The four TAPI nations must still attract commercial partners to build, finance, and operate the pipeline, estimated in 2008 to cost at least $7.6 billion.
Read more about this topic: Trans-Afghanistan Pipeline
Famous quotes containing the words technical and/or features:
“The axioms of physics translate the laws of ethics. Thus, the whole is greater than its part; reaction is equal to action; the smallest weight may be made to lift the greatest, the difference of weight being compensated by time; and many the like propositions, which have an ethical as well as physical sense. These propositions have a much more extensive and universal sense when applied to human life, than when confined to technical use.”
—Ralph Waldo Emerson (18031882)
“The features of our face are hardly more than gestures which force of habit made permanent. Nature, like the destruction of Pompeii, like the metamorphosis of a nymph into a tree, has arrested us in an accustomed movement.”
—Marcel Proust (18711922)