The pipeline will be 1,420 millimetres (56 in) in diameter with a working pressure of 100 standard atmospheres (10,000 kPa). The initial capacity will be 27 billion cubic metres (950 billion cubic feet) of natural gas per year of which 2 billion cubic metres (71 billion cubic feet) will be provided to Afghanistan and 12.5 billion cubic metres (440 billion cubic feet) to each Pakistan and India. Later the capacity will increase to 33 billion cubic metres (1.2 trillion cubic feet). Six compressor stations would be constructed along the pipeline. The pipeline was expected to be operational by 2014.
The pipeline's cost is estimated at US$7.6 billion. The Asian Development Bank has played a leading role in coordinating and facilitating the TAPI negotiation process. The four TAPI nations must still attract commercial partners to build, finance, and operate the pipeline, estimated in 2008 to cost at least $7.6 billion.
Read more about this topic: Trans-Afghanistan Pipeline
Famous quotes containing the words technical and/or features:
“When you see something that is technically sweet, you go ahead and do it and you argue about what to do about it only after you have had your technical success. That is the way it was with the atomic bomb.”
—J. Robert Oppenheimer (19041967)
“Each reader discovers for himself that, with respect to the simpler features of nature, succeeding poets have done little else than copy his similes.”
—Henry David Thoreau (18171862)