Toronto Eaton Centre - History

History

Timothy Eaton founded a dry goods store on Yonge Street in the 19th century, and that small shop went on to revolutionize retailing in Canada, ultimately becoming the largest department store chain in the country. By the 20th century, the Eaton's chain owned most of the land bounded by Yonge, Queen, Bay and Dundas streets, with the notable exceptions of Old City Hall and the Church of the Holy Trinity. The Eaton's land, once the site of Timothy Eaton's first store, was occupied by Eaton's large Main Store, the Eaton's Annex and a number of related mail order and factory buildings. As the chain's warehouse and support operations were increasingly shifting to cheaper suburban locales in the 1960s, Eaton's wanted to make better use of its valuable downtown landholdings. In particular, the chain wanted to build a massive new flagship store to replace the aging Main Store at Yonge and Queen and the Eaton's College Street store a few blocks to the north.

In the mid-1960s, Eaton's announced plans for a massive office and shopping complex that would occupy several city blocks. Initial plans for the centre called for the demolition of both Old City Hall (except for the clock tower and cenotaph) and the Church of the Holy Trinity, as well as the closing of a number of small city streets within the above-noted block (Albert Street, Louisa Street, Terauley Street, James Street, Albert Lane, Downey's Lane and Trinity Square). At one point, even the City Hall clock tower was slated for demolition. After a fierce local debate over the fate of the city hall and church buildings, Eaton's put its plans on hiatus in 1967.

The Eaton Centre plans were resuscitated in 1971, although these plans allowed for the preservation of Old City Hall. Controversy erupted anew, however, as the congregation of the Church of the Holy Trinity exhibited an increased willingness to fight the demolition plans for its church. Eventually, the Eaton Centre plans were revised to save both Old City Hall and the church, and then revised further when Holy Trinity's parishioners successfully fought to ensure that the new complex would not block all sunlight to the church.

These amendments to the plans resulted in three significant changes to the proposed centre from the initial 1960s concept. First, the new Eaton's store was shifted north to Dundas Street, as the new store would be too large to be accommodated in its traditional location on Queen Street (opposite its rival Simpson's) due to the preservation of City Hall. This resulted in the mall being constructed with Eaton's and Simpson's acting as anchors at either end. The second significant change was the reduction in the size of the office component, so that the Eaton Centre project no longer represented an attempt to extend the City's financial district north of Queen Street, as the Eaton Family had originally contemplated in the 1960s. Finally, the bulk of the centre was shifted east to the Yonge Street frontage, and the complex was designed so that it no longer had any frontage along Bay Street. Old City Hall and the Church were thus saved, as was the Salvation Army headquarters building by virtue of its location between the two other preserved buildings (although the Salvation Army building was eventually demolished in the late 1990s to make way for an Eaton Centre expansion).

Read more about this topic:  Toronto Eaton Centre

Famous quotes containing the word history:

    Anything in history or nature that can be described as changing steadily can be seen as heading toward catastrophe.
    Susan Sontag (b. 1933)

    The history of the world is none other than the progress of the consciousness of freedom.
    Georg Wilhelm Friedrich Hegel (1770–1831)

    The principle office of history I take to be this: to prevent virtuous actions from being forgotten, and that evil words and deeds should fear an infamous reputation with posterity.
    Tacitus (c. 55–117)