History
Mayflower Resolution was ordered in 2002 by Mayflower Energy Ltd. She was built by Shanhaiguan shipyard, Qinhuangdao, China as yard number TIV 1. She was named in honour of the Mayflower, which transported the second batch of settlers to the United States. She was designed by Dane Knud E Hansen and construction was supervised by Graig Shipping. Mayflower Resolution was built for Mayflower Energy Ltd, part of Mayflower Corporation. Delivery was scheduled for February 2003, but was delayed and the £20,000,000 budget was exceeded by some £10,000,000. The addition of a remotely operated vehicle to lay submarine cables pushed to final bill for her construction to £53,000,000.
Mayflower Resolution was completed in November 2003, and delivered in February 2004. The journey from Qinhuangdao to Falmouth, Cornwall took 66 days. She underwent trials in Falmouth Bay, where she was tested for the first time. Mayflower Resolution was then put to work installing wind turbines at the North Hoyle windfarm for National Wind Power. The contract ended on 23 March and Mayflower Resolution sailed to Middlesbrough, arriving on 30 March. She was due to depart for Great Yarmouth on 8 April to work on installing turbines for the Scroby Sands wind farm. On 31 March, Mayflower Corporation went into administration with debts of £17,700,000. Deloitte Touche were appointed as administrators. Mayflower Resolution was sold by the administrators for £12,000,000 to a group of Mayflower Corporation's managers who managed to get backing from Japanese bank Mizuho International
The new owners became MPI Offshore, based in Stokesley, North Yorkshire. In 2006, MPI Resolution was used in the construction of the Barrow Offshore Wind project for Centrica and DONG Energy. In 2008, Resolution was used in the construction of the Lynn and Inner Dowsing Wind Farm for Centrica. It was announced in July 2008 that two more ships were to be built, based on MPI Resolution but slightly larger. They will be built by Cosco, at their Nantong shipyard. The two new ships will be named MPI Adventure and MPI Discovery. In February 2008, Resolution was sent to Esbjerg, Denmark to work on the installation of a wind farm. In January 2009, Resolution was used in the construction of the Robin Rigg Wind Farm. In 2010, Resolution was employed in the construction of the 100-turbine Thanet wind farm, off the coast of Kent, United Kingdom, sometimes carrying and installing 9 complete turbines.
Resolution also featured in the documentary Mighty Ships, season 2.
Read more about this topic: TIV MPI Resolution
Famous quotes containing the word history:
“I think that Richard Nixon will go down in history as a true folk hero, who struck a vital blow to the whole diseased concept of the revered image and gave the American virtue of irreverence and skepticism back to the people.”
—William Burroughs (b. 1914)
“The History of the world is not the theatre of happiness. Periods of happiness are blank pages in it, for they are periods of harmonyperiods when the antithesis is in abeyance.”
—Georg Wilhelm Friedrich Hegel (17701831)
“Three million of such stones would be needed before the work was done. Three million stones of an average weight of 5,000 pounds, every stone cut precisely to fit into its destined place in the great pyramid. From the quarries they pulled the stones across the desert to the banks of the Nile. Never in the history of the world had so great a task been performed. Their faith gave them strength, and their joy gave them song.”
—William Faulkner (18971962)