Three-dimensional Integrated Circuit - Challenges

Challenges

Because this technology is new it carries new challenges, including:

Yield
Each extra manufacturing step adds a risk for defects. In order for 3D ICs to be commercially viable, defects could be repaired or tolerated, or defect density can be improved.
Heat
Heat building up within the stack must be dissipated. This is an inevitable issue as electrical proximity correlates with thermal proximity. Specific thermal hotspots must be more carefully managed.
Design complexity
Taking full advantage of 3D integration requires sophisticated design techniques and new CAD tools.
TSV-introduced overhead
TSVs are large compared to gates and impact floorplans. At the 45 nm technology node, the area footprint of a 10μm x 10μm TSV is comparable to that of about 50 gates. Furthermore, manufacturability demands landing pads and keep-out zones which further increase TSV area footprint. Depending on the technology choices, TSVs block some subset of layout resources. Via-first TSVs are manufactured before metallization, thus occupy the device layer and result in placement obstacles. Via-last TSVs are manufactured after metallization and pass through the chip. Thus, they occupy both the device and metal layers, resulting in placement and routing obstacles. While the usage of TSVs is generally expected to reduce wirelength, this depends on the number of TSVs and their characteristics. Also, the granularity of inter-die partitioning impacts wirelength. It typically decreases for moderate (blocks with 20-100 modules) and coarse (block-level partitioning) granularities, but increases for fine (gate-level partitioning) granularities.
Testing
To achieve high overall yield and reduce costs, separate testing of independent dies is essential. However, tight integration between adjacent active layers in 3D ICs entails a significant amount of interconnect between different sections of the same circuit module that were partitioned to different dies. Aside from the massive overhead introduced by required TSVs, sections of such a module, e.g., a multiplier, cannot be independently tested by conventional techniques. This particularly applies to timing-critical paths laid out in 3D.
Lack of standards
There are few standards for TSV-based 3D-IC design, manufacturing, and packaging, although this issue is being addressed. In addition, there are many integration options being explored such as via-last, via-first, via-middle; interposers or direct bonding; etc.
Heterogeneous integration supply chain
In heterogeneously integrated systems, the delay of one part from one of the different parts suppliers delays the delivery of the whole product, and so delays the revenue for each of the 3D-IC part suppliers.
Lack of clearly defined ownership
It is unclear who should own the 3D-IC integration and packaging/assembly. It could be assembly houses like ASE or the product OEMs.

Read more about this topic:  Three-dimensional Integrated Circuit

Famous quotes containing the word challenges:

    The approval of the public is to be avoided like the plague. It is absolutely essential to keep the public from entering if one wishes to avoid confusion. I must add that the public must be kept panting in expectation at the gate by a system of challenges and provocations.
    André Breton (1896–1966)

    A powerful idea communicates some of its strength to him who challenges it.
    Marcel Proust (1871–1922)