Texas State Highway Loop 275 - Route Description

Route Description

As currently configured, Loop 275 consists of two non-connected segments. The 6.0-mile (9.7 km) northern segment starts at an interchange at US 183, just west of Interstate 35. It proceeds north along Lamar Boulevard, passing FM 734, before terminating at the southbound frontage road of Interstate 35, just south of Howard Lane (Exit #246).

The 3.2-mile (5.1 km) southern segment starts at an intersection with Slaughter Lane just west of Interstate 35 (Exit #226B/227). It proceeds north along South Congress Avenue to its terminus at Williamson Creek south of US 290.

Read more about this topic:  Texas State Highway Loop 275

Famous quotes containing the words route and/or description:

    By whatever means it is accomplished, the prime business of a play is to arouse the passions of its audience so that by the route of passion may be opened up new relationships between a man and men, and between men and Man. Drama is akin to the other inventions of man in that it ought to help us to know more, and not merely to spend our feelings.
    Arthur Miller (b. 1915)

    Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built. Nor let us look down on the standpoint of the theory as make-believe; for we can never do better than occupy the standpoint of some theory or other, the best we can muster at the time.
    Willard Van Orman Quine (b. 1908)