Teesside Ef W Plant - Design and Specification

Design and Specification

The plant is a large metal-clad building. The metal is finished in the colour 'Goosewing Grey', accented in 'Solent Blue' and 'Petra Red'. The plant's clean, clear lines and colours are said to "contrast favourably" with the nearby industrial buildings.

Until 2009, the station had two operating furnace lines, which together were capable of burning a total of 250,000 tonnes of waste per year, and generated 20 MW of electricity. However in May 2009 a third line was brought into operation. The plant currently burns 360,000 tonnes of waste a year and generates 29.2 MW of electricity. This is enough electricity to power 60,000 homes.

The original plant uses Babcock and Wilcox Volund boilers to provide steam for a single Ansaldo turbo generator rated at 19.2 MW. The third line uses a Von Roll Inova reciprocating grate to burn the waste, and generates electricity using a single Von Roll Inova three-pass steam generator, rated at 10 MW.

Read more about this topic:  Teesside Ef W Plant

Famous quotes containing the word design:

    What but design of darkness to appall?—
    If design govern in a thing so small.
    Robert Frost (1874–1963)