The Asker Line runs from Lysaker Station via Sandvika Station to Asker Station, in the municipalities of Bærum and Asker. The line was built to allow increased railway traffic though the main corridor west of Oslo. Previously, the only railway west of Oslo was the Drammen Line, which has limited capacity and is used by a mix of local, regional, intercity and freight trains. This caused many delays and poor utilization of tracks, as some trains make many stops and others only a few. The Asker Line allows regional and intercity trains to by-pass local stations east of Asker while local and freight trains remain on the Drammen Line. The Asker Line was built in two stages: the first, from Asker to Sandvika, was constructed between 2001 and 2005. The second stage, from Sandvika to Lysaker, was constructed between 2007 and 2011. The other two tunnels on the Asker Line are the 3,590-meter-long (11,780 ft) Skaugm Tunnel and the 5.5-kilometer-long (3.4 mi) Bærum Tunnel.
The Norwegian National Rail Administration awarded the contract to build the Tanum Tunnel to AF Spesialprosjekt, part of AF Gruppen. The tunneling cost NOK 370 million, including the open section between Solstad and Åstad, but excluding superstructure. The main part of the tunnel was built using the drilling and blasting method, using two points of entry. Work on the tunneling started in 2002 and was concluded in February 2004. Construction included the removal of 486,000 cubic meters (17,200,000 cu ft) of earthwork and the laying of 160,000 tonnes (160,000 long tons; 180,000 short tons) of ballast. Laying of tracks, signaling, power supply and other superstructures were done by Baneservice. The cost of superstructures for the entire section from Asker to Sandvika was NOK 70 million. The work was completed by November 2004. The opening of the tunnel and the rest of the section from Asker to Sandvika took place on 27 August 2005.
A concern from people living along the tunnel was that they would be subject to low-frequency noise. Originally the municipalities of Asker and Bærum had demanded that residents be subject to a maximum of 27 decibel A-weighting (dBA), but the National Rail Administration appealed the requirements and was permitted to allow up to 32 dBA. In March 2004, a test was done in the tunnel to insure that the requirements would be met, as low-frequency sound is difficult to predict. Measurements after the opening of the tunnel showed background noise of 30 dBA, that no-one was subject to 32 dBA or higher, and that it was nearly impossible to measure the passing of trains.
Among the major concerns was leaks; during the construction on the Romerike Tunnel, there was a one-year delay and severe cost overruns due to improper leak handling methods. Therefore, one of the main focuses in the Skaugum Tunnel project was to avoid similar leaks. The contract specified a maximum leakage of 4 liters (0.88 imp gal; 1.1 US gal) per minute per 100 meters (330 ft). The contractor attempted to achieved this by extending the time used for pre-injection of concrete. However, there was still water dripping into the tunnel, which caused several types of damage. Some places the water dripped onto the track, causing rust; other places water dripped onto electrical equipment. There was also issues with water running down the walls and collecting in the cable conduit, and the water with limestone dripping on the ballast and mixing the ballast with limestone. By 2011, the emergency lighting system had to be replaced because of the high humidity. The National Rail Administration has stated that savings made to the specifications in the water and frost methods have caused higher maintenance costs because the small leaks which are present do a lot of harm. In addition, areas with leaks suffer from icing. This has been part of a national trend where older tunnels are nearly maintenance-free, while newer tunnels have incurred high maintenance costs.
Read more about this topic: Tanum Tunnel
Famous quotes containing the word history:
“When the coherence of the parts of a stone, or even that composition of parts which renders it extended; when these familiar objects, I say, are so inexplicable, and contain circumstances so repugnant and contradictory; with what assurance can we decide concerning the origin of worlds, or trace their history from eternity to eternity?”
—David Hume (17111776)
“Every generation rewrites the past. In easy times history is more or less of an ornamental art, but in times of danger we are driven to the written record by a pressing need to find answers to the riddles of today.... In times of change and danger when there is a quicksand of fear under mens reasoning, a sense of continuity with generations gone before can stretch like a lifeline across the scary present and get us past that idiot delusion of the exceptional Now that blocks good thinking.”
—John Dos Passos (18961970)
“Racism is an ism to which everyone in the world today is exposed; for or against, we must take sides. And the history of the future will differ according to the decision which we make.”
—Ruth Benedict (18871948)