Initially consisting of only a couple of tents on a shore front campus that allowed students to take their boats to school, the Tamalpais campus was fully developed over the years, but has seen its share of wear and tear. Following a 2004 bond measure, the campus underwent renovations to some of its nearly century-old buildings. The oldest building, Wood Hall, reopened in late August 2005.

The 2005-2006 academic year was delayed by five days when unhealthy levels of mold were discovered in the walls of Keyser Hall. The building was closed, and portable classrooms were used instead of Keyser's 17 classrooms. The mold grew due to runoff from the hillside the building was situated on. Keyser Hall was demolished during the summer of 2006; a state-of-the-art replacement structure, also named Keyser Hall, was opened in January 2009. School administrators are consulting with architects about the construction of a handicapped elevator in front of the school's most recognizable building, Wood Hall. Architects unveiled a plan for a four-story elevator tower in front of the school's signature archway, complete with a bridge to take handicapped students into the building. Staff were shocked at the drastic proposal, which would be costly and would have an extensive impact on the many of the campus' most well-known architectural features. An elevator of some sort may be necessary to comply with handicapped accessibility laws. Administrators have formed a committee to look into alternative ways to provide that accessibility.

Read more about this topic:  Tamalpais High School