Supply-chain Operations Reference - The Performance Measurements Pillar

The Performance Measurements Pillar

The SCOR model contains more than 150 key indicators that measure the performance of supply chain operations. These performance metrics derive from the experience and contribution of the Council members. As with the process modeling system, SCOR metrics are organized in a hierarchical structure. Level 1 metrics are at the most aggregated level, and are typically used by top decision makers to measure the performance of the company's overall supply chain. Level 1 Metrics are primary, high level measures that may cross multiple SCOR processes. Level 1 Metrics do not necessarily relate to a SCOR Level 1 process (PLAN, SOURCE, MAKE, DELIVER, RETURN).

The metrics are used in conjunction with performance attributes. The Performance Attributes are characteristics of the supply chain that permit it to be analyzed and evaluated against other supply chains with competing strategies. Just as you would describe a physical object like a piece of lumber using standard characteristics (e.g., height, width, depth), a supply chain requires standard characteristics to be described. Without these characteristics it is extremely difficult to compare an organization that chooses to be the low-cost provider against an organization that chooses to compete on reliability and performance.

Associated with the Performance Attributes are the Level 1 Metrics. These Level 1 Metrics are the calculations by which an implementing organization can measure how successful they are in achieving their desired positioning within the competitive market space.

The metrics in the Model are hierarchical, just as the process elements are hierarchical. Level 1 Metrics are created from lower level calculations. (Level 1 Metrics are primary, high level measures that may cross multiple SCOR processes. Level 1 Metrics do not necessarily relate to a SCOR Level 1 process (PLAN, SOURCE, MAKE, DELIVER, RETURN). Lower level calculations (Level 2 metrics) are generally associated with a narrower subset of processes. For example, Delivery Performance is calculated as the total number of products delivered on time and in full based on a commit date.

Read more about this topic:  Supply-chain Operations Reference

Famous quotes containing the words performance and/or pillar:

    The child to be concerned about is the one who is actively unhappy, [in school].... In the long run, a child’s emotional development has a far greater impact on his life than his school performance or the curriculum’s richness, so it is wise to do everything possible to change a situation in which a child is suffering excessively.
    Dorothy H. Cohen (20th century)

    Fame’s pillar here, at last, we set,
    Out-during marble, brass, or jet,
    Robert Herrick (1591–1674)