Super Smart Grid - Initial Work

Initial Work

An initial project proposed by Irish wind farm developer Airtricity (Formerly Eirtricity) and Swiss engineering firm ABB would provide a chain of undersea cable connections extending from the Baltic Sea southward to Spain and servicing areas between the endpoints. Proponents of the project claim that this western corridor could be in service as early as 2015. The first segments would provide two 5000 megawatt links connecting a new 10,000 megawatt group of wind parks in the North Sea with consumers in the UK and continental Europe.

Read more about this topic:  Super Smart Grid

Famous quotes containing the words initial and/or work:

    No punishment has ever possessed enough power of deterrence to prevent the commission of crimes. On the contrary, whatever the punishment, once a specific crime has appeared for the first time, its reappearance is more likely than its initial emergence could ever have been.
    Hannah Arendt (1906–1975)

    Even if matter could do every outward thing that God does, the idea of it would not work as satisfactorily, because the chief call for a God on modern men’s part is for a being who will inwardly recognize them and judge them sympathetically. Matter disappoints this craving of our ego, so God remains for most men the truer hypothesis, and indeed remains so for definite pragmatic reasons.
    William James (1842–1910)