Summerlin Parkway - History

History

Summerlin Parkway was initially constructed by the developers of Summerlin through the Summerlin Homeowners Association. The first construction along the parkway consisted of rebuilding the US 95 interchange and a divided highway west to Town Center Drive. Later projects funded by the Regional Transportation Commission of Southern Nevada brought freeway interchanges to Buffalo Drive in 1992 and Rampart Boulevard in 1994.

By 2000, Summerlin Parkway was built up to expressway standards to a western end at Anasazi Drive, and by 2004 the expressway terminated at the Las Vegas Beltway. A half-interchange was added at Durango Drive by 2005, and the Anasazi Drive intersection was converted to an interchange by 2006. Also in 2005, the Nevada Department of Transportation had reconstructed the US 95/Rainbow Boulevard interchange as part of its US 95 widening project (including a new direct connection from eastbound Summerlin Parkway to US 95 north which was not constructed in 1989).

Read more about this topic:  Summerlin Parkway

Famous quotes containing the word history:

    ... in a history of spiritual rupture, a social compact built on fantasy and collective secrets, poetry becomes more necessary than ever: it keeps the underground aquifers flowing; it is the liquid voice that can wear through stone.
    Adrienne Rich (b. 1929)

    Racism is an ism to which everyone in the world today is exposed; for or against, we must take sides. And the history of the future will differ according to the decision which we make.
    Ruth Benedict (1887–1948)

    Universal history is the history of a few metaphors.
    Jorge Luis Borges (1899–1986)