Project Description
The 93.77-kilometer, four-lane expressway is divided into two major segments:1. Package 1: Subic-Clark Segment – 50.5 kilometers (Contractor: Kajima-Obayashi-JFE Engineering-Mitsubishi Heavy Industries, Inc. Joint Venture) 2. Package 2: Clark-Tarlac segment – 43.27 kilometers (Contractor: Hazama-Taisei-Nippon Steel Joint Venture)
Read more about this topic: Subic-Clark-Tarlac Expressway
Famous quotes containing the words project and/or description:
“A candidate once called his opponent a willful, obstinate, unsavory, obnoxious, pusillanimous, pestilential, pernicious, and perversable liar without pausing for breath, and even his enemies removed their hats.”
—Federal Writers Project Of The Wor, U.S. public relief program (1935-1943)
“Everything to which we concede existence is a posit from the standpoint of a description of the theory-building process, and simultaneously real from the standpoint of the theory that is being built. Nor let us look down on the standpoint of the theory as make-believe; for we can never do better than occupy the standpoint of some theory or other, the best we can muster at the time.”
—Willard Van Orman Quine (b. 1908)