Extra-vehicular Activity
Four spacewalks were scheduled and completed during STS-120. The cumulative time in extra-vehicular activity during the mission was 27 hours and 14 minutes.
EVA | Spacewalkers | Start (UTC) | End | Duration | Mission |
---|---|---|---|---|---|
EVA1 | Scott E. Parazynski Douglas H. Wheelock |
26 October 2007 10:02 UTC |
26 October 2007 16:16 UTC |
6 hours, 14 minutes | Harmony (Node 2) installation preparation, S-Band Antenna Support Assembly (SASA) retrieval, P6/Z1 fluid line disconnections, P6 aft radiator shroud installations. |
EVA2 | Scott E. Parazynski Daniel M. Tani |
28 October 2007 09:32 UTC |
28 October 2007 16:05 UTC |
6 hours, 33 minutes | Z1 to P6 umbilical disconnections, P6 detach from Z1, S1 radiator configuration, Node 2 handrail installations, S4 starboard Solar Alpha Rotary Joint (SARJ) inspection. |
EVA3 | Scott E. Parazynski Douglas H. Wheelock |
30 October 2007 08:45 UTC |
30 October 2007 15:53 UTC |
7 hours, 08 minutes | P6 to P5 attachment. P6/P5 umbilical connections, S1 configure post-redeploy, port SARJ inspection. |
EVA4 | Scott E. Parazynski Douglas H. Wheelock |
3 November 2007 10:03 UTC |
3 November 2007 17:22 UTC |
7 hours, 19 minutes | Inspection and repair of P6 Solar Array. |
Read more about this topic: STS-120
Famous quotes containing the word activity:
“History does nothing; it does not possess immense riches, it does not fight battles. It is men, real, living, who do all this.... It is not history which uses men as a means of achievingas if it were an individual personits own ends. History is nothing but the activity of men in pursuit of their ends.”