Improvements/StarMetro Renaissance Project
From 2006-2009, StarMetro began a makeover including new routes, stations, and stops. One planned change is the addition of two new transfer stops. These stops will make it possible to travel across Tallahassee without changing buses at the downtown hub station. In addition, StarMetro is planning wireless internet and television in buses, GPS-enabled buses with live location maps over the Internet, solar-lighted stops with live location maps, and blinking lights at stops to let drivers know of waiting passengers. The C.K. Steele station includes renovation and installation of information kiosks. The new shuttle buses seats are mostly made of padded plastic and are arranged front-facing in rows and sideways against the walls, much like subway car layout. All models in use except the Dial-A-Ride shuttle vans exceed 4000 pounds, and therefore are not equipped with seat belts.
StarMetro is currently working on a complete route overhaul dubbed "Nova2010", which will reduce the current system to only 11 routes, of which only 4 will meet at the CK Steele Plaza. The routes will run at shorter intervals than the current routes while providing transfer points all over the city—no longer requiring all two-bus trips to transfer at the CK Steele Plaza. Some trips will require two transfers, but will still result in a more direct and faster trip than transferring at the Plaza. Nova2010 will not be implemented until the fall of 2010, so the route planning is still in its very early stages.
Read more about this topic: Star Metro
Famous quotes containing the words improvements and/or project:
“The improvements of ages have had but little influence on the essential laws of mans existence: as our skeletons, probably, are not to be distinguished from those of our ancestors.”
—Henry David Thoreau (18171862)
“She cannot love,
Nor take no shape nor project of affection,
She is so self-endeared.”
—William Shakespeare (15641616)