The Standard Time is the product of three factors:

  1. Observed time: The time measured to complete the task.
  2. Performance rating factor: The pace the person is working at. 90% is working slower than normal, 110% is working faster than normal, 100% is normal. This factor is calculated by an experienced worker who is trained to observe and determine the rating.
  3. Personal, fatigue, and delay (PFD) allowance.

The standard time can then be calculated by using:

Read more about this topic:  Standard Time (manufacturing)

Famous quotes containing the words method of, method and/or calculation:

    Steady labor with the hands, which engrosses the attention also, is unquestionably the best method of removing palaver and sentimentality out of one’s style, both of speaking and writing.
    Henry David Thoreau (1817–1862)

    There is no method but to be very intelligent.
    —T.S. (Thomas Stearns)

    Common sense is the measure of the possible; it is composed of experience and prevision; it is calculation appled to life.
    Henri-Frédéric Amiel (1821–1881)