St Nicholas' Church, Brighton - Rebuilding in 1853

Rebuilding in 1853

Brighton underwent considerable change during the reign of King George IV (the former Prince Regent) from 1820 to 1830. The town continued to be fashionable, and the number of houses doubled during his 10½-year reign. Eight chapels of ease had been built by 1830 to alleviate the burden on the overcrowded St Nicholas church, but the latter remained popular as it was free to attend. Furthermore, the administrative vestry of the church (the equivalent of the present-day Church of England Parochial Church Council) was ideologically opposed to the responsibility they faced in raising funds for maintaining the fabric of the church. There were frequent disagreements and clashes with the vicar, Rev. H. W. Wagner, and deadlock was often reached over the issue of funding - to such an extent that the church became somewhat dilapidated and some of the windows in the chancel had to be boarded up.

The situation was resolved, however, in 1852, when the Duke of Wellington, Arthur Wellesley, died. There were historical links between the Duke and both Rev. Wagner and St. Nicholas Church itself: as a child in the 1780s, he studied for a time at an academy in Nile Street (in what is now The Lanes in the city centre) run by Rev. Wagner's grandfather Rev. H. Michell; he attended St. Nicholas Church, which at the time was under the curacy of Rev. Michell, to worship; and his sons were taught by Rev. Wagner himself for eight years from 1818. Rev. Wagner therefore announced that he would start a fund to pay for the rebuilding of the church as a memorial to the Duke, and donated the first £1,000. Nearly £5,000 more was subsequently raised from public subscriptions and donations.

The architect Richard Cromwell Carpenter, associated with the architectural aspects of the Cambridge Movement and Tractarianism, was chosen to rebuild St Nicholas Church, after authorisation was granted on 15 April 1853 for demolition and reconstruction. The project was completed quite rapidly, given the size of the building, by Carpenter and the appointed building firm (Bushby's of Littlehampton): the church was reopened on 8 April 1854, about nine months after work started.

Work included a new roof; a doubling of the width of the original aisles, and extensions to some of them; a reduction in the size of the chantry; the creation of an organ-chamber and a new east window; the removal of all galleries and original box-pews; and the moving of the font to a position near the south door, which it occupied until the latest move in 2001. A stone cross was installed to commemorate the Duke of Wellington. Carpenter himself died only a year after the project was completed, and a memorial plaque - now lost - was installed in recognition of his life and works. The reconstruction, which cost £5,769, reduced the capacity of the church by approximately 30% to around 900 because the galleries were removed.

Read more about this topic:  St Nicholas' Church, Brighton

Famous quotes containing the word rebuilding:

    ... most Southerners of my parents’ era were raised to feel that it wasn’t respectable to be rich. We felt that all patriotic Southerners had lost everything in defense of the South, and sufficient time hadn’t elapsed for respectable rebuilding of financial security in a war- impoverished region.
    Sarah Patton Boyle, U.S. civil rights activist and author. The Desegregated Heart, part 1, ch. 1 (1962)