Recent Construction

In 2001, the school began construction of a new, two-story wing to accommodate the growing influx of students. The construction did not complete soon enough, however, and the school was soon faced with the problem of a ballooning student population in an inadequate facility. During the construction, overflow classes were relocated to portable classrooms, as well as bussed to a nearby "teaching annex", located on Bell Farm Road, approximately ten minutes from the school. Students were asked to share lockers to accommodate the space shortage. The school ran lunch periods in shifts throughout the day, as the cafeteria was ill-equipped to hold even half of its students. The wing opened in September 2003, complete with new music and art rooms, three new computer labs, a recording and green-screen studio, an extension on the existing cafeteria, a darkroom, as well as many new classrooms and hundreds of additional lockers. Unfortunately many lockers and class rooms at the school remain empty as enrollment has fallen in recent years.

Read more about this topic:  St. Joseph's High School (Barrie)

Famous quotes containing the word construction:

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)