Construction
Construction of the first five Leader locomotives began at the Southern Railway's Brighton railway works in July 1947. British Railways inherited the Leader project upon nationalisation in 1948, which was far enough advanced to continue constructing the prototype, as Bulleid was still Chief Mechanical Engineer of the newly formed Southern Region of British Railways. Although work on the other four locomotives stalled, the prototype Leader emerged from Brighton as locomotive No. 36001 in June 1949.
The other four members of the initial order made by the Southern Railway, Nos. 36002–5, were at varying stages of construction by the end of the development period. No. 36002 was almost complete, No. 36003 was without its outer casing, and Nos. 36004–5 were little more than sets of frames, although most of their major components had been constructed at Eastleigh and Brighton and were stored ready for fitting. With no prospect of further money being allocated by the Railway Executive for their completion, the unfinished locomotives were put into store at various depots around the former Southern Railway network pending a decision on their future.
Read more about this topic: SR Leader Class
Famous quotes containing the word construction:
“The construction of life is at present in the power of facts far more than convictions.”
—Walter Benjamin (18921940)
“There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.”
—John Dewey (18591952)
“Theres no art
To find the minds construction in the face:
He was a gentleman on whom I built
An absolute trust.”
—William Shakespeare (15641616)