Spitfire - Development and Production - Manufacturing at Castle Bromwich

Manufacturing At Castle Bromwich

In 1935, the Air Ministry approached Morris Motors Limited to ask how quickly their Cowley plant could be turned to aircraft production. This informal asking of major manufacturing facilities was turned into a formal plan to boost British aircraft production capacity in 1936, as the Shadow factory plan, under the leadership of Herbert Austin. Austin was briefed to build nine new factories, and further supplement the existing British car manufacturing industry, by either adding to its overall capacity or capability to reorganise to produce aircraft and their engines.

Under the plan, on 12 July 1938, the Air Ministry bought a site consisting of farm fields and a sewage works next to Castle Bromwich Aerodrome in Birmingham. This shadow factory would supplement Supermarine's original factories in Southampton in building the Spitfire. The Castle Bromwich Aircraft Factory ordered the most modern machine tools then available, which were being installed two months after work started on the site. Although Morris Motors under Lord Nuffield (an expert in mass motor-vehicle construction) at first managed and equipped the factory, it was funded by government money. When the project was first mooted it was estimated that the factory would be built for £2,000,000, however, by the beginning of 1939 this cost had doubled to over £4,000,000. The Spitfire's stressed-skin construction required precision engineering skills and techniques outside the experience of the local labour force, which took some time to train. However, even as the first Spitfires were being built in June 1940 the factory was still incomplete, and there were numerous problems with the factory management, which ignored tooling and drawings provided by Supermarine in favour of tools and drawings of its own designs, and with the workforce which, while not completely stopping production, continually threatened strikes or "slow downs" until their demands for higher than average pay rates were met.

By May 1940, Castle Bromwich had not yet built its first Spitfire, in spite of promises that the factory would be producing 60 per week starting in April. On 17 May Lord Beaverbrook, Minister of Aircraft Production, telephoned Lord Nuffield and manoeuvered him into handing over control of the Castle Bromwich plant to Beaverbook's Ministry. Beaverbrook immediately sent in experienced management staff and experienced workers from Supermarine and gave over control of the factory to Vickers-Armstrong. Although it would take some time to resolve the problems, in June 1940, 10 Mk IIs were built; 23 rolled out in July, 37 in August, and 56 in September. By the time production ended at Castle Bromwich in June 1945, a total of 12,129 Spitfires (921 Mk IIs, 4,489 Mk Vs, 5,665 Mk IXs, and 1,054 Mk XVIs) had been built. CBAF went on to become the largest and most successful plant of its type during the 1939-45 conflict. As the largest Spitfire factory in the UK, by producing a maximum of 320 aircraft per month, it built over half of the approximately 20,000 aircraft of this type.

Read more about this topic:  Spitfire, Development and Production

Famous quotes containing the word castle:

    Let me be at the place of the castle.
    Let the castle be within me.
    Denise Levertov (b. 1923)