Design Considerations
The largest flood that needs be considered in the evaluation of a given project, regardless of whether a spillway is provided; i.e., a given project should have structures capable of safely passing the appropriate spillway design flood (SDF). A 100-year recurrence interval is the flood magnitude expected to be exceeded on the average of once in 100 years. It may also be expressed as an exceedance frequency with a one per cent chance of being exceeded in any given year.
Read more about this topic: Spillway
Famous quotes containing the word design:
“If I knew for a certainty that a man was coming to my house with the conscious design of doing me good, I should run for my life ... for fear that I should get some of his good done to me,some of its virus mingled with my blood.”
—Henry David Thoreau (18171862)