SBIRS High (also now simply referred to as "SBIRS") is to consist of four dedicated satellites operating in geosynchronous earth orbit, and sensors on two host satellites operating in a highly elliptical orbit. SBIRS High will replace the Defense Support Program satellites and is intended primarily to provide enhanced strategic and theater ballistic missile warning capabilities. SBIRS High GEO 1 was launched on May 7, 2011. Two SBIRS sensors hosted on two classified satellites in highly elliptical orbit have already been launched, probably as part of the NROL-22 (USA 184) and NROL-28 (USA 200) launches in 2006 and 2008.
The prime contractor for SBIRS is Lockheed Martin, with Northrop Grumman as the major subcontractor. Lockheed Martin also provides the satellite for SBIRS GEO. The system's expected deployment was delayed from December 2009 to 2011 because of problems with Lockheed's workmanship on system components, including unresolved software malfunctions and several broken solder joints in a subcontract procured gyroscope assembly on the first spacecraft being built.
It was feared that a further launch postponement into late 2011 would lead to conflict with the planned launches of NASA's Juno spacecraft and Mars Science Laboratory, which will all use the same launch facility. However, the first GEO launch, GEO-1, was successfully conducted on May 7, 2011.
Read more about this topic: Space-Based Infrared System
Famous quotes containing the word high:
“Good breeding ... differs, if at all, from high breeding only as it gracefully remembers the rights of others, rather than gracefully insists on its own rights.”
—Thomas Carlyle (17951881)