Southend Cliff Railway - History

History

The line runs on the site of a pioneering moving walkway, a forerunner of today's escalator. This was constructed in 1901 by the American engineer Jesse W. Reno, but soon proved noisy and unreliable due its exposed location. The current lift was constructed by Waygood & Company, now part of the famous Otis Elevator Company. Since opening in 1912 it has been modernised three times, in 1930, 1959 and 1990. Each modernisation has resulted in the replacement of the car.

In 2003 the line was closed due to technical problems, and refurbishment was undertaken on the stations. However during the time that it was closed, the regulations governing its operation changed, requiring modifications before it could be reopened. The line finally re-opened on 25 May 2010, after a restoration costing a total of £3 million, £650,000 on the car alone.

Read more about this topic:  Southend Cliff Railway

Famous quotes containing the word history:

    It may be well to remember that the highest level of moral aspiration recorded in history was reached by a few ancient Jews—Micah, Isaiah, and the rest—who took no count whatever of what might not happen to them after death. It is not obvious to me why the same point should not by and by be reached by the Gentiles.
    Thomas Henry Huxley (1825–95)

    When the history of this period is written, [William Jennings] Bryan will stand out as one of the most remarkable men of his generation and one of the biggest political men of our country.
    William Howard Taft (1857–1930)

    Look through the whole history of countries professing the Romish religion, and you will uniformly find the leaven of this besetting and accursed principle of action—that the end will sanction any means.
    Samuel Taylor Coleridge (1772–1834)