South Western Main Line - Future Development

Future Development

In July 2011, Network Rail in its London & South East Route Utilisation Strategy (RUS) recommended adding a fifth track to the four-track stretch of line between Clapham Junction and Surbiton. This was found to be feasible within the existing rail corridor, and was seen as the most practicable way of providing more capacity on the route. It would permit up to eight additional trains to run in the peak hour, for a total of 32 trains per hour on the SWML. The scheme would also involve remodelling the approaches to Waterloo to convert one Windsor Line track for use by mainline trains. Options rejected in the RUS as not viable included double-deck trains, building a flyover at Woking, and introducing 12- or 16-car trains.

Read more about this topic:  South Western Main Line

Famous quotes containing the words future and/or development:

    You have too much of a life yet before you, and have shown too much of promise as an officer, for your future to be lightly surrendered.
    Abraham Lincoln (1809–1865)

    The development of civilization and industry in general has always shown itself so active in the destruction of forests that everything that has been done for their conservation and production is completely insignificant in comparison.
    Karl Marx (1818–1883)