South Carolina Highway 30 - Route Description

Route Description

SC 30 begins at South Carolina Highway 171 on James Island, at exit 3. From there, the highway runs northeast, and has two interchanges south of the Ashley River crossing. Exit 2 has access to Harbor View Road and exit 1 is for the Herbert U. Fielding Connector (SC 61).

The route is an orphaned segment of Interstate 526. Approximately 7 miles (11 km) separate the eastern terminus of SC 30 from the eastern terminus of I-526's current extent. Mileage markers and exit numbers on both SC 30 and I-526 are based on an eventual merging of the routes: with miles 1 to 3 occurring on SC 30 and miles 10 to 30 used on the current Interstate 526 route.

Read more about this topic:  South Carolina Highway 30

Famous quotes containing the words route and/or description:

    In the mountains the shortest route is from peak to peak, but for that you must have long legs. Aphorisms should be peaks: and those to whom they are spoken should be big and tall of stature.
    Friedrich Nietzsche (1844–1900)

    A sound mind in a sound body, is a short, but full description of a happy state in this World: he that has these two, has little more to wish for; and he that wants either of them, will be little the better for anything else.
    John Locke (1632–1704)