SMS Braunschweig - Construction

Construction

Braunschweig was laid down in 1901, at the Germaniawerft in Kiel under construction number 97. The first of her class, she was ordered under the contract name "H" as a new unit for the fleet. The ship cost 23,983,000 marks. Braunschweig was launched on 20 December 1902 and commissioned into the fleet on 15 October 1904.

The ship was 127.7 m (419 ft) long overall and had a beam of 22.2 m (73 ft) and a draft of 8.1 m (27 ft) forward. The ship was powered by three 3-cylinder vertical triple expansion engines that drove three screws. Steam was provided by eight naval and six cylindrical boilers, all of which burned coal. Braunschweig's powerplant was rated at 16,000 indicated horsepower (12,000 kW), which generated a top speed of 18 knots (33 km/h).

Braunschweig's armament consisted of a main battery of four 28 cm (11 in) SK L/40 guns in twin gun turrets, one fore and one aft of the central superstructure. Her secondary armament consisted of fourteen 17 cm (6.7 inch) SK L/40 guns and eighteen 8.8 cm (3.45 in) SK L/35 quick-firing guns. The armament suite was rounded out with six 45 cm (18 in) torpedo tubes, all mounted submerged in the hull.

Read more about this topic:  SMS Braunschweig

Famous quotes containing the word construction:

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)

    Striving toward a goal puts a more pleasing construction on our advance toward death.
    Mason Cooley (b. 1927)

    There is, I think, no point in the philosophy of progressive education which is sounder than its emphasis upon the importance of the participation of the learner in the formation of the purposes which direct his activities in the learning process, just as there is no defect in traditional education greater than its failure to secure the active cooperation of the pupil in construction of the purposes involved in his studying.
    John Dewey (1859–1952)