SM UB-6 - Design and Construction

Design and Construction

After the German Army's rapid advance along the North Sea coast in the earliest stages of World War I, the German Imperial Navy found itself without suitable submarines that could be operated in the narrow and shallow seas off Flanders. Project 34, a design effort begun in mid-August 1914, produced the Type UB I design: a small submarine that could be shipped by rail to a port of operations and quickly assembled. Constrained by railroad size limitations, the UB I design called for a boat about 92 feet (28 m) long and displacing about 125 metric tons (138 short tons) with two torpedo tubes. UB-6 was part of the initial allotment of eight submarines—numbered UB-1 to UB-8—ordered on 15 October from Germaniawerft of Kiel, just shy of two months after planning for the class began.

UB-6 was laid down by Germaniawerft in Kiel on 22 November. As built, UB-6 was 92 feet 2 inches (28.09 m) long, 10 feet 6 inches (3.20 m) abeam, and had a draft of 9 feet 10 inches (3.00 m). She had a single 60-brake-horsepower (45 kW) Daimler 4-cylinder diesel engine for surface travel, and a single 120-shaft-horsepower (89 kW) Siemens-Schuckert electric motor for underwater travel, both attached to a single propeller shaft. Her top speeds were 6.47 knots (11.98 km/h), surfaced, and 5.51 knots (10.20 km/h), submerged. At more moderate speeds, she could sail up to 1,650 nautical miles (3,060 km) on the surface before refueling, and up to 45 nautical miles (83 km) submerged before recharging her batteries. Like all boats of the class, UB-6 was rated to a diving depth of 50 metres (160 ft), and could completely submerge in 33 seconds.

UB-6 was armed with two 45-centimeter (17.7 in) torpedoes in two bow torpedo tubes. She was also outfitted for a single 88-millimeter (3.5 in) Deck gun. UB-6's standard complement consisted of one officer and thirteen enlisted men.

After work on UB-6 was complete at the Germaniwerft yard, UB-6 was readied for rail shipment. The process of shipping a UB I boat involved breaking the submarine down into what was essentially a knock down kit. Each boat was broken into approximately fifteen pieces and loaded on to eight railway flatcars. In early 1915, the sections of UB-6 were shipped to Antwerp for assembly in what was typically a two- to three-week process. After UB-6 was assembled and launched sometime in March, she was loaded on a barge and taken through canals to Bruges where she underwent trials.

Read more about this topic:  SM UB-6

Famous quotes containing the words design and/or construction:

    To nourish children and raise them against odds is in any time, any place, more valuable than to fix bolts in cars or design nuclear weapons.
    Marilyn French (20th century)

    No real “vital” character in fiction is altogether a conscious construction of the author. On the contrary, it may be a sort of parasitic growth upon the author’s personality, developing by internal necessity as much as by external addition.
    —T.S. (Thomas Stearns)