SM UB-10 - Design and Construction

Design and Construction

After the German Army's rapid advance along the North Sea coast in the earliest stages of World War I, the German Imperial Navy found itself without suitable submarines that could be operated in the narrow and shallow seas off Flanders. Project 34, a design effort begun in mid-August 1914, produced the Type UB I design: a small submarine that could be shipped by rail to a port of operations and quickly assembled. Constrained by railroad size limitations, the UB I design called for a boat about 92 feet (28 m) long and displacing about 125 metric tons (138 short tons) with two torpedo tubes.

UB-10 was part of the initial allotment of seven submarines—numbered UB-9 to UB-15—ordered on 15 October from AG Weser of Bremen, just shy of two months after planning for the class began. UB-10 was laid down by Weser in Bremen on 7 November. As built, UB-10 was 91 feet 6 inches (27.89 m) long, 10 feet 6 inches (3.20 m) abeam, and had a draft of 9 feet 10 inches (3.00 m). She had a single 60-brake-horsepower (45 kW) Körting 4-cylinder diesel engine for surface travel, and a single 120-shaft-horsepower (89 kW) Siemens-Schuckert electric motor for underwater travel, both attached to a single propeller shaft. Her top speeds were 7.45 knots (13.80 km/h), surfaced, and 6.24 knots (11.56 km/h), submerged. At more moderate speeds, she could sail up to 1,500 nautical miles (2,800 km) on the surface before refueling, and up to 45 nautical miles (83 km) submerged before recharging her batteries. Like all boats of the class, UB-10 was rated to a diving depth of 50 meters (160 ft), and could completely submerge in 33 seconds.

UB-10 was armed with two 45-centimeter (17.7 in) torpedoes in two bow torpedo tubes. She was also outfitted for a single 8-millimeter (0.31 in) machine gun on deck. UB-10's standard complement consisted of one officer and thirteen enlisted men.

After work on UB-10 was complete at the Weser yard, she was readied for rail shipment. The process of shipping a UB I boat involved breaking the submarine down into what was essentially a knock down kit. Each boat was broken into approximately fifteen pieces and loaded on to eight railway flatcars. In early 1915, the sections of UB-10 were shipped to Antwerp for assembly in what was typically a two- to three-week process. After UB-10 was assembled and launched on 20 February, she was loaded on a barge and taken through canals to Bruges where she underwent trials.

Read more about this topic:  SM UB-10

Famous quotes containing the words design and/or construction:

    If I commit suicide, it will not be to destroy myself but to put myself back together again. Suicide will be for me only one means of violently reconquering myself, of brutally invading my being, of anticipating the unpredictable approaches of God. By suicide, I reintroduce my design in nature, I shall for the first time give things the shape of my will.
    Antonin Artaud (1896–1948)

    The construction of life is at present in the power of facts far more than convictions.
    Walter Benjamin (1892–1940)