SM U-29 (Austria-Hungary) - Design and Construction

Design and Construction

Austria-Hungary's U-boat fleet was largely obsolete at the outbreak of World War I. The Austro-Hungarian Navy satisfied its most urgent needs by purchasing five Type UB I submarines that comprised the U-10 class from Germany, by raising and recommissioning the sunken French submarine Curie as U-14, and by building four submarines of the U-20 class that were based on the 1911 Danish Havmanden class.

After these steps alleviated their most urgent needs, the Austro-Hungarian Navy selected the German Type UB II design for its newest submarines in mid 1915. The Germans were reluctant to allocate any of their wartime resources to Austro-Hungarian construction, but were willing to sell plans for up to six of the UB II boats to be constructed under license in Austria-Hungary. The Navy agreed to the proposal and purchased the plans from AG Weser of Bremen.

U-29 displaced 264 metric tons (260 long tons) surfaced and 301 metric tons (296 long tons) submerged. She had a single hull with saddle tanks, and was 121 feet 1 inch (36.91 m) long with a beam of 14 feet 4 inches (4.37 m) and a draft of 12 feet 2 inches (3.71 m). For propulsion, she had two shafts, twin diesel engines of 270 bhp (200 kW) for surface running, and twin electric motors of 280 shp (210 kW) for submerged travel. She was capable of 9 knots (16.7 km/h) while surfaced and 7.5 knots (13.9 km/h) while submerged. Although there is no specific notation of a range for U-29 in Conway's All the World's Fighting Ships, 1906–1921, the German UB II boats, upon which the U-27 class was based, had a range of over 6,000 nautical miles (11,000 km) at 5 knots (9.3 km/h) surfaced, and 45 nautical miles (83 km) at 4 knots (7.4 km/h) submerged. U-27-class boats were designed for a crew of 23–24.

U-29 was armed with two 45 cm (17.7 in) bow torpedo tubes and could carry a complement of four torpedoes. She was also equipped with a 75 mm/26 (3.0 in) deck gun and an 8 mm (0.31 in) machine gun.

After intricate political negotiations to allocate production of the class between Austrian and Hungarian firms, U-27 was ordered from Ganz Danubius on 12 October 1915. She was laid down on 3 March 1916 at Fiume and launched on 21 October.

Read more about this topic:  SM U-29 (Austria-Hungary)

Famous quotes containing the words design and/or construction:

    You can make as good a design out of an American turkey as a Japanese out of his native stork.
    —For the State of Illinois, U.S. public relief program (1935-1943)

    There’s no art
    To find the mind’s construction in the face.
    William Shakespeare (1564–1616)