Additional Duties

In addition to the requirements laid out in the regulations the client and principal contractor must, so far as is reasonably practicable, comply with a number of additional duties laid out in the schedule to the regulations.

These include:

  • Ensuring cooperation between contractors during the construction phase.
  • Induction, information and training for every worker, with respect to the site waste management plan.
  • Ensuring that waste produced is reused, recycled or recovered

There are also a number of other requirements relating to joint responsibilities for both the client and principal contractor. Failure to comply with this schedule is also an offence.

Read more about this topic:  Site Waste Management Plans Regulations 2008

Famous quotes containing the words additional and/or duties:

    The world will never be long without some good reason to hate the unhappy; their real faults are immediately detected, and if those are not sufficient to sink them into infamy, an additional weight of calumny will be superadded.
    Samuel Johnson (1709–1784)

    The application requisite to the duties of the office I hold [governor of Virginia] is so excessive, and the execution of them after all so imperfect, that I have determined to retire from it at the close of the present campaign.
    Thomas Jefferson (1743–1826)