Simplon Tunnel - Facts and Figures

Facts and Figures

  • Length of tunnel I: 19,803 m (12.305 mi)
  • Length of tunnel II: 19,823 m (12.317 mi)
  • Elevation at north portal, Brig: 685.80 m (2,250.0 ft)
  • Elevation at crest of the tunnel: 704.98 m (2,312.9 ft)
  • Elevation at south portal, Iselle: 633.48 m (2,078.3 ft)
  • Gradient on north side: 0.2%
  • Gradient on south side: 0.7% ( 1 in 143)
  • Start of construction on north side: 22 November 1898
  • Start of construction of south side: 21 December 1898
  • Breakthrough: 24 February 1905
  • Inauguration: 19 May 1906
  • First electrical operation: 1 June 1906

Read more about this topic:  Simplon Tunnel

Famous quotes containing the words facts and/or figures:

    One would appear ridiculous who would say, that it is only probable the sun will rise to-morrow, or that all men must die; though it is plain we have no further assurance of these facts than what experience affords us.
    David Hume (1711–1776)

    I will stand on, and continue to use, the figures I have used, because I believe they are correct. Now, I’m not going to deny that you don’t now and then slip up on something; no one bats a thousand.
    Ronald Reagan (b. 1911)