Shenzhen Bao'an International Airport - Airport Expansion Project

Airport Expansion Project

Since the beginning of 2008 the 1.6 km long terminal 3 is being built. This new terminal will be between the current runway and another runway currently being built. Architect: Massimiliano Fuksas, Rome; Structure, Facade and Parametric Design: Knippers Helbig, Stuttgart. A second runway running parallel to the west of the current runway will also be built. The new runway will be built on reclamation land extending out towards the Pearl River Delta, with a length of 3600 meters and 60 meters wide. The second runway was completed in June, 2011 and started operations in July, 2011 but capacity will be restricted until the new terminal is opened. This is due to air movements will need to cross the existing runway to access the older terminals to the east. It is hoped and expected that the new terminal will be opened during 2012.

Read more about this topic:  Shenzhen Bao'an International Airport

Famous quotes containing the words airport, expansion and/or project:

    Airplanes are invariably scheduled to depart at such times as 7:54, 9:21 or 11:37. This extreme specificity has the effect on the novice of instilling in him the twin beliefs that he will be arriving at 10:08, 1:43 or 4:22, and that he should get to the airport on time. These beliefs are not only erroneous but actually unhealthy.
    Fran Lebowitz (b. 1950)

    Artistic genius is an expansion of monkey imitativeness.
    W. Winwood Reade (1838–1875)

    Although I mean it, and project the meaning
    As hard as I can into its brushed-metal surface,
    It cannot, in this deteriorating climate, pick up
    Where I leave off.
    John Ashbery (b. 1927)