Shelby Street Bridge - Repair Work

Repair Work

After twenty-five years of use, it became apparent that there was something wrong with the concrete on the Sparkman Street Bridge. The worn surfaces of the concrete were chipped away between 1927 and 1930 and replaced with gunite.

Thirty years later, repair work had to be done again. The Standard Engineering Company of Albany, New York was hired to repair the weathered bridge. They subcontracted the steel work to the Nashville Bridge Company. During this repair time, the Jefferson Street Bridge was also repaired.

Read more about this topic:  Shelby Street Bridge

Famous quotes containing the words repair and/or work:

    Billboards, billboards, drink this, eat that, use all manner of things, everyone, the best, the cheapest, the purest and most satisfying of all their available counterparts. Red lights flicker on every horizon, airplanes beware; cars flash by, more lights. Workers repair the gas main. Signs, signs, lights, lights, streets, streets.
    Neal Cassady (1926–1968)

    Most of our platitudes notwithstanding, self-deception remains the most difficult deception. The tricks that work on others count for nothing in that very well-lit back alley where one keeps assignations with oneself: no winning smiles will do here, no prettily drawn lists of good intentions.
    Joan Didion (b. 1934)