Shelby Street Bridge - Closure and Reopening

Closure and Reopening

State inspectors declared the bridge to be in "poor" condition in 1992, and the bridge was closed to vehicular traffic in 1998. The bridge was originally slated for demolition. However, due to aesthetic, architectural, and historical considerations, it was decided that it should be converted to a pedestrian bridge rather than be demolished. The success of the Walnut Street Bridge as a part of Chattanooga's urban renewal efforts was a major consideration in keeping the bridge.

The bridge was refurbished and includes an elevator, ramps, and stairways. The bridge has a center lane that is fifteen feet across to accommodate bicycles. Originally it was thought that a trolley might use the center lane, but that idea was abandoned in favor of a bicycle lane. On each side of the bicycle lane are 10-foot-wide (3.0 m) elevated boardwalk-style sidewalks. The bridge includes four scenic pedestrian overlooks that, in the metal of the railing, have artistic renderings of the history of life on the Cumberland River. The bridge is dramatically lit at night.

The refurbished bridge is part of the Metro Nashville Greenway system, which is administered by the Parks Department. The Eastern terminus includes a pedestrian plaza with special landscaping and is very close to LP Field. The Western terminus comes out facing the Schermerhorn Symphony Center and is very close to the Country Music Hall of Fame and the Bridgestone Arena.

The refurbishment of the bridge cost in excess of $15 million and was done under the supervision and planning of the Tennessee Department of Transportation. A new bridge called The Gateway Bridge was built to handle the vehicle traffic that used to travel over the Shelby Street Bridge.

Read more about this topic:  Shelby Street Bridge