Sheffield Canal - Engineering

Engineering

There were originally twelve locks in the Tinsley flight, which rises 70 feet (21 m) but in order to accommodate a new railway bridge, locks 7 and 8 were combined in 1959, with a single concrete chamber replacing both of them. The modern numbering scheme has locks 1 to 6, 7/8 and 9 to 12. Water for the top pound, and hence the locks, is pumped from a small building situated below Tinsley Viaduct. This originally housed a steam engine to drive the pumps, but this was replaced by a duty and standby 125 hp diesel engine in 1918. The pumps supply 3,500 gallons per minute (265 l/s) to an outlet near the top lock of the flight.

Read more about this topic:  Sheffield Canal

Famous quotes containing the word engineering:

    Mining today is an affair of mathematics, of finance, of the latest in engineering skill. Cautious men behind polished desks in San Francisco figure out in advance the amount of metal to a cubic yard, the number of yards washed a day, the cost of each operation. They have no need of grubstakes.
    Merle Colby, U.S. public relief program (1935-1943)