Current Developments
Network Rail is currently remodelling the track layout at Severn Tunnel Junction in conjunction with resignalling work, due to be completed by 2014. This will provide improved operational flexibility, reduce maintenance costs and re-instate a fourth through platform. SEWTA intends use the opportunity to improve passenger facilities at the station.
Since 4 January 2010 the new track configuration is in use. The South Wales Main Line now uses platforms 3 and 4 and Gloucester to Newport Line platforms 1 and 2. There are no rail connections between the platforms east of the station as high-speed (70 mph) crossovers have been provided to the west.
Read more about this topic: Severn Tunnel Junction Railway Station
Famous quotes containing the words current and/or developments:
“The current of our thoughts made as sudden bends as the river, which was continually opening new prospects to the east or south, but we are aware that rivers flow most rapidly and shallowest at these points.”
—Henry David Thoreau (18171862)
“The developments in the North were those loosely embraced in the term modernization and included urbanization, industrialization, and mechanization. While those changes went forward apace, the antebellum South changed comparatively little, clinging to its rural, agricultural, labor-intensive economy and its traditional folk culture.”
—C. Vann Woodward (b. 1908)