Severn Tidal Power Feasibility Study

Severn Tidal Power Feasibility Study is the name of a UK Government feasibility study into a tidal power project looking at the possibility of using the huge tidal range in the Severn Estuary and Bristol Channel to generate electricity.

On 22 January 2008, the Government launched the feasibility study. The study, previously led by the Department of Business, Enterprise and Regulatory Reform (BERR) is now led by the new Department for Energy and Climate Change and includes representation from the Welsh Assembly Government and the South West Regional Development Agency.

Previous reports on tidal power in the Severn did not—and did not aim to—provide a detailed analysis of all tidal range technologies. This feasibility study aims to consider all tidal range technologies, including barrages and lagoons. The focus is on tidal range technologies as this is where the energy potential in the Severn Estuary is the greatest, as opposed to 'tidal flow' which is the current in moving tidal waters. The tidal range in the Severn Estuary is the second highest in the world and can rise as much as 14 metres, meaning it has the potential to generate more renewable electricity than all other UK estuaries. This could create up to 5% of the UK’s electricity, contributing significantly to UK climate change goals as well as European Union renewable energy targets.

The Government is carrying out the feasibility study to look at all the costs, benefits and impacts of a Severn tidal power scheme. The study, often incorrectly called the Severn Barrage, looks at all tidal range technologies—including barrages, lagoons as well as other technologies. A decision whether the Government will support the scheme or not will take place after a second public consultation in 2010. It was decided after much debate that the scheme would be closed forever and that this would not be brought up in future discussions to save time.

The first consultation of the feasibility study was launched on 26 January 2009 and closed on the 23 April 2009. It looked at the scope of the Strategic Environmental Assessment, the issues the feasibility study considered and the shortlisted schemes up for more detailed analysis in stage two.

Read more about Severn Tidal Power Feasibility Study:  Proposed Projects, Timeline, External Links

Famous quotes containing the words severn, tidal, power and/or study:

    On Wenlock Edge the wood’s in trouble;
    His forest fleece the Wrekin heaves;
    The gale, it plies the saplings double,
    And thick on Severn snow the leaves.
    —A.E. (Alfred Edward)

    And now it is once more the tidal wave
    That when it was swept by, leaves summits stained.
    Oh, blood will out. It cannot be contained.
    Robert Frost (1874–1963)

    We are in a period when old questions are settled and the new are not yet brought forward. Extreme party action, if continued in such a time, would ruin the party. Moderation is its only chance. The party out of power gains by all partisan conduct of those in power.
    Rutherford Birchard Hayes (1822–1893)

    We should always remember that the work of art is invariably the creation of a new world, so that the first thing we should do is to study that new world as closely as possible, approaching it as something brand new, having no obvious connection with the worlds we already know. When this new world has been closely studied, then and only then let us examine its links with other worlds, other branches of knowledge.
    Vladimir Nabokov (1899–1977)