Semmering Railway - Semmering Base Tunnel

Semmering Base Tunnel

On April 25, 2012 ground was broken for the construction of the 27.3km Semmering base tunnel. This tunnel will bypass 41km of the Semmeringbahn. The tunnel is expected to open in 2024, with a total cost of €3.1b.

Read more about this topic:  Semmering Railway

Famous quotes containing the words base and/or tunnel:

    What I often forget about students, especially undergraduates, is that surface appearances are misleading. Most of them are at base as conventional as Presbyterian deacons.
    Muriel Beadle (b. 1915)

    It is the light
    At the end of the tunnel as it might be seen
    By him looking out somberly at the shower,
    The picture of hope a dying man might turn away from,
    Realizing that hope is something else, something concrete
    You can’t have.
    John Ashbery (b. 1927)