Second Avenue Subway - Background

Background

Originally proposed in 1929 as part of a massive expansion of the Independent Subway System (IND), work on the line never commenced, as the Great Depression crushed the economy of the state and country. Need for the Second Avenue Subway line grew, especially in recent years, as the East Side of Manhattan experienced significant residential development. Currently, the lone rapid transit option on the Upper East Side is the four-track IRT Lexington Avenue Line, the most crowded in the country. Its average of 1.3 million daily riders on this single line exceeds the daily traffic load of the entire Washington Metro system (which has the second-highest ridership in the U.S.), and exceeds the combined daily ridership of the rail transit systems of San Francisco and Boston. Local bus routes are just as crowded during various times of the day. The construction of the Second Avenue line would add another two tracks to fill the gap that has existed since the elevated IRT Second Avenue Line was demolished in 1940–42 and the IRT Third Avenue Line was removed in 1955–56.

The city started planning, again, in 1945, to build the new subway and bought a prototype train (the R11) in 1949 for use on the new line. New York voters approved bond acts for its construction in 1951 and in 1967. Money from the 1951 bond measure was diverted to buy new cars, lengthen platforms, and maintain other parts of the aging New York City subway system. The proceeds of the 1967 bond act were partly used to begin tunneling under Second Avenue. Digging began in 1972; however, a few years later, the city became insolvent. "It's the most famous thing that's never been built in New York City, so everyone is skeptical and rightly so," said Gene Russianoff, an advocate for subway riders since 1981. "It's much-promised and never delivered."

On November 8, 2005, voters in New York State passed the Transportation Bond Act, which will, among other projects, partially fund construction of the line. Its passage had been seen as critical to its construction. After warning that failure to pass the act would doom the project, MTA chairman Peter S. Kalikow stated that "Now it's up to us to complete the job" given its approval by a 55–45 percent margin.

In August 2006, the MTA revealed that all future subway stations, including ones built for the Second Avenue subway, the 7 Subway Extension, and the new South Ferry station will be outfitted with air-cooling systems to reduce the temperature along platforms.

In November 2007, Mary Peters, the United States Secretary of Transportation announced that the Second Avenue Subway would receive $1.3 billion in federal funding for the project's first phase, to be funded over a seven-year period.

Read more about this topic:  Second Avenue Subway

Famous quotes containing the word background:

    In the true sense one’s native land, with its background of tradition, early impressions, reminiscences and other things dear to one, is not enough to make sensitive human beings feel at home.
    Emma Goldman (1869–1940)

    ... every experience in life enriches one’s background and should teach valuable lessons.
    Mary Barnett Gilson (1877–?)

    I had many problems in my conduct of the office being contrasted with President Kennedy’s conduct in the office, with my manner of dealing with things and his manner, with my accent and his accent, with my background and his background. He was a great public hero, and anything I did that someone didn’t approve of, they would always feel that President Kennedy wouldn’t have done that.
    Lyndon Baines Johnson (1908–1973)