SEA-ME-WE 4 - History

History

The SEA-ME-WE 4 cable system was developed by a consortium of 16 telecommunications companies which agreed to construct the project on 27 March 2004. Construction of the system was carried out by Alcatel Submarine Networks (now Alcatel-Lucent Submarine Networks, a division of Alcatel-Lucent) and Fujitsu. The eighteen month construction project was completed on 13 December 2005 with a cost estimate of US$500 million. Segment 1 construction, running 8,000 kilometres from Singapore to India, was done by Fujitsu, which also provided the submarine repeater equipment for Segment 4.

Read more about this topic:  SEA-ME-WE 4

Famous quotes containing the word history:

    Three million of such stones would be needed before the work was done. Three million stones of an average weight of 5,000 pounds, every stone cut precisely to fit into its destined place in the great pyramid. From the quarries they pulled the stones across the desert to the banks of the Nile. Never in the history of the world had so great a task been performed. Their faith gave them strength, and their joy gave them song.
    William Faulkner (1897–1962)

    When the history of guilt is written, parents who refuse their children money will be right up there in the Top Ten.
    Erma Brombeck (20th century)

    There is one great fact, characteristic of this our nineteenth century, a fact which no party dares deny. On the one hand, there have started into life industrial and scientific forces which no epoch of former human history had ever suspected. On the other hand, there exist symptoms of decay, far surpassing the horrors recorded of the latter times of the Roman empire. In our days everything seems pregnant with its contrary.
    Karl Marx (1818–1883)