Water Project
Due to inadequate potable water supply to the First Nation, the Saugeen First Nation received a significant water and sewer improvement assistance of $14 million in the 2006-2007 fiscal year to provide the First Nation with clean treated drinking water. The new system consists of a connection to the town of Saugeen Shores municipal water supply system, construction of a pump house and above grade reservoir, a water distribution system, back-up electrical generating system, elevated storage reservoir (water tower), and the decommissioning of six pump houses and associated small-diameter water mains. The drinking water is still treated in the Southampton's new Zenon Environmental Water Treatment Plant. The improvement project was completed in July, 2008.
Read more about this topic: Saugeen First Nation
Famous quotes containing the words water and/or project:
“The favor of a drop of water should be repaid as an overflowing spring.”
—Chinese proverb.
“If we should swap a good library for a second-rate stump speech and not ask for boot, it would be thoroughly in tune with our hearts. For deep within each of us lies politics. It is our football, baseball, and tennis rolled into one. We enjoy it; we will hitch up and drive for miles in order to hear and applaud the vitriolic phrases of a candidate we have already reckoned well vote against.”
—Federal Writers Project Of The Wor, U.S. public relief program (1935-1943)