Lines
The region's lines were mainly built by three railway companies (the Cologne-Minden Railway Company, the Bergisch-Märkische Railway Company and the Rhenish Railway Company), giving the Rhine-Ruhr S-Bahn a variety of lines to use for its routes. This means that the S-Bahn lines use up to five different railways to run over.
Line | Route | Railways used | Length | Opening date of first section | First section |
---|---|---|---|---|---|
S 1 | Dortmund – Bochum – Essen – Mülheim (Ruhr) – Duisburg – Düsseldorf Airport – Düsseldorf – Hilden – Solingen | Dortmund–Duisburg, Duisburg–Düsseldorf, Düsseldorf–Solingen | 97 km | 26.05.1974 | Bochum – DU-Großenbaum |
S 2 | Dortmund – Dortmund-Dorstfeld – Dortmund-Mengede – Herne – (Gelsenkirchen – (Oberhausen – Duisburg) or Essen) or Recklinghausen | Dortmund–Dortmund-Dorstfeld, Dortmund-Dorstfeld–Dortmund-Mengede, Dortmund-Mengede–Herne/Gelsenkirchen/Duisburg, and part of Gelsenkirchen–Essen or Herne–Recklinghausen | 58 / 42 / 33 km | 02.06.1991 | Dortmund – Duisburg |
S 3 | Oberhausen – Mülheim (Ruhr) – Essen – Essen-Steele – Hattingen (Ruhr) Mitte | Oberhausen–Essen-Steele Ost, Essen-Steele Ost–Bochum-Dahlhausen, Bochum-Dahlhausen–Hattingen (Ruhr) Mitte | 33 km | 26.05.1974 | Oberhausen – Hattingen (Ruhr) |
S 4 | Dortmund-Lütgendortmund – Dortmund–Dorstfeld – Unna-Königsborn – Unna | Dortmund-Lütgendortmund–Dortmund Süd, Dortmund Süd–Unna-Königsborn, Unna-Königsborn–Unna | 30 km | 03.06.1984 | DO-Germania – Unna |
S 5 | Dortmund – Witten – Wetter (Ruhr) – Hagen | Dortmund–Hagen | 31 km | 29.05.1994 | Whole length |
S 6 | Essen – Ratingen Ost – Düsseldorf – Langenfeld (Rheinl) – Cologne – Cologne-Nippes | Essen–Essen-Werden, Essen-Werden–Düsseldorf, Düsseldorf–Cologne, Cologne–Köln-Nippes | 78 km | 28.09.1967 | Ratingen Ost – D-Garath |
S 8 | Hagen – Wuppertal – Wuppertal-Vohwinkel – Düsseldorf – Neuss – Mönchengladbach | Hagen-Schwelm, Schwelm–Wuppertal, Wuppertal–Düsseldorf, Düsseldorf–Mönchengladbach | 82 km | 29.05.1988 | Whole length |
S 9 | Haltern am See – Gladbeck West – Bottrop – Essen – Essen-Steele – Velbert-Langenberg – Wuppertal-Vohwinkel – Wuppertal | Haltern–Essen-Dellwig Ost, Essen-Dellwig Ost–Essen West, Essen West–Essen-Steele, Essen-Steele–Wuppertal-Vohwinkel, Wuppertal-Vohwinkel–Wuppertal | 90 km | 24.05.1998 | Haltern – Essen-Steele |
S 28 | Mettmann Stadtwald – Düsseldorf – Neuss – Kaarster See | Mettmann Stadtwald–Düsseldorf, Düsseldorf–Neuss, Neuss–Kaarster See | 34 km | 26.09.1999 | Whole length |
S 68 | Wuppertal-Vohwinkel – Düsseldorf – Langenfeld (Rheinl) | Wuppertal–Düsseldorf, Düsseldorf–Langenfeld | 39 km | 13.12.2009 | Whole length |
Read more about this topic: Rhein-Ruhr S-Bahn
Famous quotes containing the word lines:
“There is something to be said for government by a great aristocracy which has furnished leaders to the nation in peace and war for generations; even a Democrat like myself must admit this. But there is absolutely nothing to be said for government by a plutocracy, for government by men very powerful in certain lines and gifted with the money touch, but with ideals which in their essence are merely those of so many glorified pawnbrokers.”
—Theodore Roosevelt (18581919)
“His more memorable passages are as naturally bright as gleams of sunshine in misty weather. Nature furnishes him not only with words, but with stereotyped lines and sentences from her mint.”
—Henry David Thoreau (18171862)
“When the rose reigns, and locks with ointments shine,
Let rigid Cato read these lines of mine.”
—Robert Herrick (15911674)